Predicting interlocking malfunctions for the railway network in Germany
Transportation research procedia, vol. 72, pp. 3481–3488
Abstract
Interlockings generate a major part of all malfunctions on the German railway network infrastructure. Therefore, predictions of future malfunctions are essential to optimize the distribution of available maintenance and renewal funds. This work compares different regression methods to predict the number of malfunctions on individual interlockings. These methods are trained and tested on a data set provided by the German infrastructure manager ‘DB Netz AG’. Using the obtained models, the importance of available feature data to the prediction quality is analyzed.
Authors 6
-
Affiliation as printed
Institute of Transport Science, RWTH Aachen University, Mies-van-der-Rohe-Str, 1, 52074 Aachen, Germany
-
Affiliation as printed
Institute of Transport Science, RWTH Aachen University, Mies-van-der-Rohe-Str, 1, 52074 Aachen, Germany
-
Affiliation as printed
DB Netz AG, Adam-Riese-Str.11-13, 60327 Frankfurt a.M., Germany
-
Affiliation as printed
DB Netz AG, Adam-Riese-Str.11-13, 60327 Frankfurt a.M., Germany
-
Affiliation as printed
DB Netz AG, Adam-Riese-Str.11-13, 60327 Frankfurt a.M., Germany
-
Affiliation as printed
Institute of Transport Science, RWTH Aachen University, Mies-van-der-Rohe-Str, 1, 52074 Aachen, Germany
Cited by 2 stored of 2
2 results
No patents citing this paper on Lens.org (checked 2026-10-06).
References 17
-
W6675354045details pending0citations
-
W6612700976details pending0citations
-
W6779745604details pending0citations
-
W6792175537details pending0citations
17 results