Bridging Uncertainty Management and Requirements Engineering in R&D projects: a case in the e-mobility sector
Procedia CIRP, vol. 119, pp. 321–326
Abstract
Complex systems R&D projects aim to explore innovative solution alternatives characterized by multiple uncertainties, requiring open specification in the early development stages. At the same time, complex systems development relies on detailed requirements management. In such projects, it may be necessary to monitor uncertainties evolution along with requirements management to balance innovation potential with implementation feasibility. This paper presents an approach to bridging uncertainty management and requirements engineering in R&D projects. The proposed approach has been applied in developing an electric vehicle charging robot. The paper contributes to the literature on the intersection between requirements engineering and innovation management.
Authors 6
-
Heiner Hans Heimes Aachen
Affiliation as printed
RWTH Aachen University, Production Engineering of E-Mobility Components (PEM), Bohr, 12, Aachen, 52072, Germany
-
Achim Kampker Aachen
Affiliation as printed
RWTH Aachen University, Production Engineering of E-Mobility Components (PEM), Bohr, 12, Aachen, 52072, Germany
-
Mario Kehrer Aachen
Affiliation as printed
RWTH Aachen University, Production Engineering of E-Mobility Components (PEM), Bohr, 12, Aachen, 52072, Germany
-
Jonathan Gerz Aachen
Affiliation as printed
RWTH Aachen University, Production Engineering of E-Mobility Components (PEM), Bohr, 12, Aachen, 52072, Germany
-
Affiliation as printed
University of São Paulo, Polytechnic School, Production Engineering Department, Av. Prof. Luciano Gualberto, 1380, São Paulo (SP), 05508-010, Brazil
-
Affiliation as printed
RWTH Aachen University, Production Engineering of E-Mobility Components (PEM), Bohr, 12, Aachen, 52072, Germany
Cited by 1 stored of 1
1 result
No patents citing this paper on Lens.org (checked 2026-10-06).